Showing posts with label snowblowers. Show all posts
Showing posts with label snowblowers. Show all posts

Thursday, January 24, 2013

No. 1 in Snow Jobs


In Syracuse, the forecast calls for shoveling.

New York's fifth-largest city gets the most snow in the U.S., with 103 inches per year, according to AccuWeather. Erie, Pa., comes in second at 101 inches, and Flagstaff, Ariz., ranks third at 100 inches.

These are the lands of frosty fingers and aching backs. Making the job a little easier, though, is a snowblower, which can reduce the strain and lifting of shoveling.  Spread Sheet looked into snowblower sales to see which region ranks No. 1. Coming in first is the Northeast, where 40% of the country's snowblowers are sold, according to data from Sears Holdings. Next is the Midwest, where 28% of Sears's snowblowers are sold. The Northwest accounts for 20% of sales, and the South and Southwest get 12% of sales.

Demand for snowblowers is highest in December, when 29% of all units are sold, with sales tapering down to 10% in January.

Snowblowers have become easier to maneuver in recent years, says Dean Schwartz, vice president and general merchandise manager for lawn and garden at Sears Holdings. Two-stage snowblowers are the most powerful and effective, experts say. These work by first picking up snow with a metal auger and then shooting the snow out of a chute from a fast-spinning impeller.

Of course, many still opt for the tried-and-true shovel.

"Even if you have a really good snowblower, it can't get into the nooks and crannies, like steps and stairs," says Martin Tirado, a Milwaukee resident and executive director of Snow & Ice Management Association, a trade organization for the snow-removal industry. "Everyone has a shovel."

Karen Benvin Ransom, associate broker at Houlihan Lawrence, owns a plastic shovel but rarely uses it. Instead, she hires a plow service to clear the 10,000-square-foot driveway at her Katonah, N.Y., home. "I don't even have to call them," she says. "They just show up."

Each plowing costs just under $100, she says, adding that there were 26 snowstorms during her first winter at the house about 20 years ago. "That was a fortune, an absolute fortune," Ms. Benvin Ransom says. The snow has slowed since then—the service has only had to clear away snow twice this season.

Paul Vanderzon, chief executive of Deneigement Vanderzon, a snow-clearing service just outside Montreal, has about 3,400 residential clients within four square miles. Using commercial-grade snow-removal equipment, a skilled driver can clear 150 driveways in four hours, he says.

Last year's mild winter caused his clientele to dip slightly, Mr. Vanderzon says. Although more people are signing up this year, he says "there are still those die-hards who decide not to sign on and whip out the shovel instead.

Sanette Tanaka       www.professional.wsj.com

Monday, October 22, 2012

Power Regeneration System Generates Power Instead of Heat



Case study: Briggs & Stratton’s first-of-its-kind power regeneration system cuts costs in reliability lab. Global small engine maker captures wasted energy, expects to save $50,000 per year, and modernizes data collection and control system.

October 8 -- Lawn mower and small engine parts manufacturer Briggs & Stratton was spending over $1 million in fuel costs alone to run engine endurance tests in its labs. To cut costs and realize the power wasted in heat from existing dynamometers, Briggs & Stratton worked with an automation vendor to develop a new power regeneration system. The new system helped Briggs & Stratton win two honors for sustainability, and the 556,000 kWh expected output could power 48 homes each year.

Daily, around the clock, the buzz of small engines fills the reliability laboratory inside Briggs & Stratton’s main plant near Milwaukee, Wis. Employees monitor the prototype and modified engines to meet the exacting standards set by one of the largest producers of lawn mowers, snowblowers, and other outdoor power equipment.

“Our task is to flush out failures in the lab, and prove the durability and safety of the design before it’s sold to a customer,” explained Ray Matuszak, test engineering manager, Briggs & Stratton. “Continuous, consistent, and accurate measurement of test time and operating characteristics are vital to establishing the engine’s long-term reliability.”

In February 2011, Matuszak and his team began gleaning this critical information from fully automated test stands that also provide a first-of-its-kind benefit—regenerating power for the plant. These innovative technologies helped Briggs & Stratton’s reliability lab become one of the most advanced in the industry, and quickly earned the company awards for environmental sustainability.

But overcoming the many challenges associated with the project took four years of effort and ingenuity.

The reliability lab’s endless endurance tests are costly. Briggs & Stratton was spending nearly $1 million in fuel cost alone to run engine endurance tests in the labs.

Briggs & Stratton engineers realized they could lower operating costs if they could capture power that’s wasted in heat from the existing dynamometers. Their goal was to harness that energy and convert it into electricity for the plant’s consumption.

The problem was this type of power regeneration system didn’t exist. And the cost of creating it, engineers worried, might be too high to justify the investment.

Besides, the reliability lab needed other advanced technology to meet its core goals. First on the list: an automated supervisory control and data acquisition system with customized visualization and historical tracking capabilities.

At the time, clipboard-carrying technicians manually monitored each engine during its life span in the lab, recording load, various operating temperatures and other key metrics. This labor-intensive, information-gathering system was prone to inconsistencies and human error.

As engineers from both companies began brainstorming the custom requirements for the project, they also focused on ways to achieve the best return on investment. One potential opportunity: a “Focus on Energy” grant from Wisconsin, which—like many states—had begun offering incentives to boost the use of clean, renewable power.

The engineers worked to compete for the state funding in 2008 and again in 2009. On their third try, they won a grant to pay half the cost of a pilot project.

The combined engineering team spent the next several months collaborating closely on keeping the captured electricity within the plant while maintaining a smooth and safe connection with the external power grid. Automation engineers worked with the local utility company, We Energies, to accommodate both power flows.

On the data-acquisition side, the biggest hurdle was establishing what information needed to be captured by the automated system, and what controls and safeguards would be included in the system. Then there were the discussions about control details, how engine operating characteristics should be displayed, along with understandable terms and data system custom features.

“For technicians accustomed to recording information on a clipboard, an interactive touchscreen presented a major mind shift,” said Richard Feustel, corporate energy services manager, Briggs & Stratton.

The automation vendor “walked a roomful of us through hours of whiteboarding, explaining options on how to enter, acquire, and share data. Everybody who would be affected by the conversion had an opportunity to contribute to the planning, so we got exactly what we wanted. That also made the later transition in the lab easier, because our folks had been part of the design process,” Feustel said.

In February 2011, the pilot program went online with 12 test stands designed for use with various engine types and horsepower limits. Each test stand is run by an alternating current (ac) motor using a variable frequency drive (VFD). The drives run at fixed speeds to start a gasoline engine. Once the gasoline engine is up to speed, the motor and drive load the engine to a torque level based on the engine horsepower rating. Alternatively, the system is capable of controlling complex duty cycles with varying loads and speeds as defined by the operator.

The regeneration system captures the power output of the gasoline engines and creates electricity with that power. All 12 ac motors and drives convert to a common direct current (dc) bus supply. The dc bus supply then converts the dc to ac, and synchronizes to the ac line, where all the power is directed back to the internal grid—reducing the need for electricity from the outside utility.

Six local enclosures provide two functions: local control of the drives for setup and up to six thermocouples per engine. Data used to monitor engine health and diagnose potential failures—including test run-time, multiple temperatures, alternator voltage, and engine speed and torque—goes to a programmable automation controller (PAC) via an Ethernet network.

With human-machine interface software, engineers and technicians can view critical, real-time information on engine load, speed, temperature, test-run time, oil-use rates, and other critical variables on any industrial computer in the lab. Historian software automatically captures that real-time data for analysis using Microsoft Excel, and technicians can identify any trending for use by reliability engineers.

Briggs & Stratton also invested in industrial energy management software, a comprehensive Web-based application that logs and analyzes energy-use data within one plant or from multiple, related sites. The energy management team at Briggs & Stratton uses the software to gather information about electrical, gas, and steam usage from power monitoring devices installed around the Milwaukee campus. Energy managers can access that information in the industrial energy management software and create reports about energy-use trends to share with the various departments in the plant. This information helps identify top-priority power issues.

It made perfect sense to invest the energy management software “so we could benchmark our power use and track our savings,” Feustel said. “Before, the only information we had about our energy use came in our electrical bills.”

Results

Briggs & Stratton engines are tested and regenerate electricity for use within the plant via regeneration stations. Courtesy: Rockwell AutomationBriggs & Stratton quickly achieved a range of benefits, some expected and others that pleasantly surprised the company.

The reliability lab is on track to generate as much as 556,000 kWh annually—equal to the amount needed to power 48 homes every year. That captured electricity is fed back to the plant’s internal grid, which the company hopes will save an estimated $50,000 a year.

Another environmental plus: the electricity generated by the 12 test stands alone reduces the plant’s greenhouse gases by 442 tons annually.

The regeneration project was a major reason Briggs & Stratton received two prestigious honors for sustainability in 2011. The Environmental Innovation Award from the Wisconsin Manufacturers and Commerce, and the Galaxy Star of Energy Efficiency Award from the Alliance to Save Energy were presented in Washington, D.C., to Briggs & Stratton’s Chairman, President and CEO Todd Teske by Wisconsin U.S. Senator Herb Kohl.

In accepting the Environmental Innovation Award, Briggs & Stratton thanked its automation vendor for its role in creating the regeneration system.

Matuszak acknowledges the importance of the regeneration system itself, but contends the new automated data-acquisition and control capabilities are equally valuable.

“Certainly without the payback derived from power regeneration, this project would not have gone forward,” Matuszak said. “But automated data acquisition and control has a lot of positive effects on the bottom line. The most important benefit is improved test fidelity—we have streamlined data collection versus the crude traditional methods. We can tell instantly when an engine is not operating normally or when a test is set up incorrectly. The new system also increases productivity and efficiency by freeing technicians for other tasks.” Feustel and Matuszak agreed they’d like to eventually expand the project, but first they must harvest all the insights from the initial phase.

“The variety and volume of information is outstanding,” Feustel said. “We’re still learning how to best utilize the data we’re getting from the 12 test stands.” However, Briggs & Stratton is quickly expanding its use of industrial energy management software, and its ability to track, analyze, and visualize energy-use data from multiple locations. The company has installed a dozen power monitors in its Milwaukee facility that feed information into the software. Soon, Briggs & Stratton plans to put five monitors in its plant in Murray, Ky., and within five years expects to place them in the company’s 10 other manufacturing facilities worldwide.

“With the Web-based system, we can view other plants’ metrics and track our energy usage and spending across the enterprise,” Feustel explained. “Adding onto this global dashboard...is so easy, it simplifies the process of becoming even more sustainable.”

Return on investment details

Project cost: $216,800

Project savings: $48,031/year (533,678 kWh regenerated from expected engine testing at $0.088/kWh)

Simple payback: 4.5 yr (2.0 years with FoE Grant)

Focus on Energy Grant: $118,600

Completion date: 02/28/2011

Award: The building received the Wisconsin Green Building Alliance Sustainability and Energy Efficiency (SE2) Award Special Citation.

Monday, January 10, 2011

American Honda Recalls Snowblowers Due to Fire Hazard

WASHINGTON, DC -- December 29 -- The US Consumer Product Safety Commission, in cooperation with the firm named below, today announced a voluntary recall of the following consumer product. Consumers should stop using recalled products immediately unless otherwise instructed. It is illegal to resell or attempt to resell a recalled consumer product.

Name of Product: Honda snowblowers

Units: About 18,500

Importer: American Honda Motor Co. Inc., of Torrance, Calif.

Hazard: The fuel tank joint and O-ring located on the underside of the fuel tank can seep or drip fuel over time, posing a fire hazard.

Incidents/Injuries: Honda has received 90 reports of fuel either seeping or dripping. No fires have been reported.

Description: This recall involves Honda snowblowers with model numbers and frame serial numbers listed below. The snowblowers are red and black. The frame serial number is located on the rear of the machine just below the engine. The name Honda and the model number are located on the side of the front scoop.

Model
Frame Serial Number
HS724
SZBE-1037913 through 1046577
HS928
SZAS-1151080 through 1169012
HS1132
SZBF-1018734 through 1025998

Sold at: Honda Power Equipment dealers nationwide from April 2005 through November 2010 for between $2,000 and $3,400.

Manufactured in: Japan

Remedy: Consumers should immediately stop using the recalled snowblowers and contact any Honda Power Equipment dealer to arrange for a free fuel tank joint and O-ring replacement. Registered owners of the recalled snowblowers will be mailed a notice.

Consumer Contact: For additional information, contact Honda at (888) 888-3139 between 8:30 a.m. and 5 p.m. ET Monday through Friday, or visit the firm's website at     www.hondapowerequipment.com